PJM Issued First Backup-Generator Warnings During Heat Wave
AI Summary
The new warnings process saw its first operational use as PJM neared record demand, but the grid operator says no large-load backup generators were called to run.
Discussion
Sign in to join the discussion.
Loading comments…