Updated logo UPDATED Back to feed
build deploy The Register July 13, 2026

Photovoltaics are still running after a year under Swiss trains

Photovoltaics are still running after a year under Swiss trains
AI Summary

It is just over a year since a pilot project to install photovoltaics on a railway line kicked off. According to the CEO of Sun-Ways, the company behind the scheme, the challenge was not so much technical as regulatory. The project, a 100-meter photovoltaic installation on a railway line open to traffic, was inaugurated on April 24, 2025 in Buttes, Switzerland.

0 views
Read full article
Read it on Updated — Tech News. Ahead of the Curve.
Discussion
Sign in to join the discussion.
Loading comments…