Updated logo UPDATED Back to feed
pulse TechSpot May 11, 2026

A data center used 29 million gallons of water without a bill, while residents complained about low water pressure

A data center used 29 million gallons of water without a bill, while residents complained about low water pressure
AI Summary

A county investigation traced the problem to a nearby data center development operated by Quality Technology Services (QTS), where two high-capacity water connections were not being properly monitored. One had been installed without the utility's knowledge, and another was not tied to a billing account.

0 views
Read full article
Read it on Updated — Tech News. Ahead of the Curve.
Discussion
Sign in to join the discussion.
Loading comments…